The project was started in June 2009 and is due to be completed
in December of 2009.
This job is part of a larger DownerEDI Works and Ontrack
contract.
Stage One of the job in the Mihiwaka Tunnel was to realign and
strengthen the bluestone walls. Stage Two was to strengthen a
section of the brick roof and the bluestone base below.
Due to the nature of the environment, a confined space with
limited ventilation, for health and safety reason, we could not use
any petrol powered equipment in the tunnel. Instead, our proven
hydraulic handsaws and bar saws, hydraulic core drills and electric
core drills were used.